
Wallworks was the general trades contractor for this 41,000-square-foot facility that includes STEM education labs, classrooms, and maker spaces. Construction began in February 2023 and was completed by January 2025,
The Chemours Community STEM Hub, designed by WRT Design, is a $26 million state-of-the-art facility designed to empower students and community members alike through science, technology, engineering, and mathematics (STEM) education.
Wallworks worked closely with the Construction Manager, EDiS, on the project which included the construction of a 3-story addition and extensive renovation of the existing facility.